石膏线机械厂家

News

Contact Us

Company name: Linyi Zhouxing Building Materials Co., Ltd.

Sales Manager:Ada Yan

Phone:0086-13793941918

Director: Mr zhou

Phone:0086-13791556681

Tel: 0086-539-7952337

Company address: Luozhuang high tech Development Zone, Linyi, Shandong



How to maintain the plaster line equipment? See how the manufacturer does it

position: Home >> News >> Company News

How to maintain the plaster line equipment? See how the manufacturer does it

Date:2017-11-27 Author: Click:

 

How to maintain the plaster line equipment? See how the manufacturer does it

Gypsum line equipment manufacturers, maintenance departments should be "three checks and one time (self check, mutual inspection, full-time inspection and one time pass"), and constantly summarize the maintenance experience, improve the quality of maintenance.

Maintenance should not be procrastinating on a regular basis. Special circumstances must be postponed after approval by the specialized workers, but generally it is not more than half of the period of maintenance.

We must carry out the principle of "maintenance and emphasis, prevention first". We must regularly maintain and enforce the relationship, correctly handle the relationship between use, maintenance and repair, and do not allow it to be used without maintenance.

Gypsum line equipment manufacturers, in order to ensure the equipment often is in good technical condition, ready to be put into operation, reduce downtime, improve machine intact rate and utilization rate, reduce stone wear, prolong service life, reduce operation and maintenance costs and ensure the safety in production, we must strengthen the full automatic gypsum line mechanical equipment maintenance work;

Plaster line equipment manufacturers, to ensure the quality, according to the prescribed items and requirements by item by item, shall not be insured or not insured. The problems found in the maintenance project, the quality of maintenance and the maintenance should be recorded and reported to the Department.

Gypsum line equipment manufacturers, management department of regular supervision and inspection of each unit maintenance, maintenance of quality checks regularly or irregularly, and the jiangyoufalie.

The wear of the sliding parts of the plaster line packing machine. There will be some friction in the use of machinery, especially for the automatic PVC gypsum ceiling production line, the upper plate machine, the down board machine, the code plate machine and the palletizing machine. It is necessary to check the slideways, slideways and sliders regularly. If the wear is serious, it needs to be replaced in time. These parts do not require large disassembly of the machinery, and the replacement is simple.

Pay attention to the tightness of the chain and other transmission parts, and make appropriate adjustment according to the production conditions.

In the case of unbalance pressure of the gypsum line equipment, the force on both sides of the plasterboard will be different and the speed of advance is different, so there will be a deviation. In this case, it is necessary to adjust the pressure between the various pressure rollers. If the machine is used for cylinder control, it is necessary to adjust the telescopic distance of the cylinder.


Tags:石膏线厂家

Browse:

Share
Welcome to leave us a message
Please enter the message here, we will contact you as soon as possible.
Name
Contacts
Phone
Phone
Email
Email
Address
Address