Company name: Linyi Zhouxing Building Materials Co., Ltd.
Sales Manager:Ada Yan
Phone:0086-13793941918
Director: Mr zhou
Phone:0086-13791556681
Tel: 0086-539-7952337
Company address: Luozhuang high tech Development Zone, Linyi, Shandong
How to quickly install the fixed plaster line?
The poor fixation of the plaster line is easy to cause a long time to fall off. How fast and stable installation of gypsum line? Gaomi City Guan Zhuang gypsum mould factory has arranged a method for everyone.
First in the installation position needs to clean the original putty, the main purpose is to prevent the installation of plaster line for a long time may fall off.
Secondly, in the part of the wall is vertex with the fountain shells on the line, the gypsum line installation position to determine, after the gypsum line up, 45 degree angle saw ends, plaster powder water mix well, of course not mix too much, otherwise it will fall hard, the important point is on both sides gypsum line evenly scraped, then before the gypsum line attached to the drawing of the line position, hold 3-5 minutes fixed.