石膏线机械厂家

News

Contact Us

Company name: Linyi Zhouxing Building Materials Co., Ltd.

Sales Manager:Ada Yan

Phone:0086-13793941918

Director: Mr zhou

Phone:0086-13791556681

Tel: 0086-539-7952337

Company address: Luozhuang high tech Development Zone, Linyi, Shandong



when to stick the plaster line?

position: Home >> News >> Company News

when to stick the plaster line?

Date:2017-11-25 Author: Click:

when to stick the plaster line?

The general plaster line is installed at home after the decoration of the water and electricity.

石膏线厂家

  

Installation attention

First, choose gypsum thread, gypsum quality and price, and purchase, choose the gypsum line that match the height of the building, the color of the wall, the degree of decoration, and personal preferences. The method of installation is different and the effect will be different.

Two, the installation should avoid the plaster line pressure deformation, the joint should be smooth, the line body should be clean, line straight. The movements of the installers should be skillful, quick and sharp.

Three, the best oil workers have sand paper grinding process, and repair the completion of the completion; the effect should not see the joint, defects, and indoor environment capacity as a whole.

Two installation methods of plaster line

The installation process of the sticky wire method is that the base putty must be removed and the cement mortar plastering layer will also be exposed. This is very important, and it will avoid the continuous falling of gypsum line. The glue fast sticky powder, that is in tune with, but also can avoid more waste. It can be installed with point type, but the point interval can not be too large. The most important thing is that after the line is attached to the angle by the angle, the pressure must be pressed for more than one minute. Use the fingers to fill the gap that can be seen. Also pay attention: then the brush can be dipped in water to clean the surface of the plaster line. If it is completely dry, it is difficult to handle smooth and smooth.

The installation process of nail line method:

In the first 1. mould gypsum line cable worst drill 2 10 mm hole, for example, is 2 meters long, 2 from the first to the middle 55 cm, and then put the position to install painted drilled 2 holes with the pencil position, take down the hole with 10 mm hammer drills, put up the plastic plug or a cork, a person holding gypsum line, a person with self tapping screws to fix.

2. the corner of the wall is fixed first, and the wooden side needs to be treated as a slope based on the size and shape of the plaster line, and the plaster line is drilled and then fixed with a self tapping nail.


Tags:石膏线厂家

Browse:

Share
Welcome to leave us a message
Please enter the message here, we will contact you as soon as possible.
Name
Contacts
Phone
Phone
Email
Email
Address
Address